Roughly one third of the shops and other businesses in Teme Street, the Crossing Lights and Christmas Decorations lost their power this afternoon.
The fault has been traced to a single cable and EON are currently excavating in search of the problem.
The duty "jointer" is on his way to Tenbury to splice in a new section of cable. Early indications point at "old" infrastructure rather than overload or other reason for the fault developing.
It is hoped that the power will be restored in the next four hours, or at the very worst by very early morning.
Friday 3 December 2010
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment